Projects

Projects Cirone Construction

Projects Cirone Construction

Browse Our Projects Gallery

You can count on Cirone Construction & Carting for affordable dumpster rental and excavation services. We are committed to taking care of all your needs as carefully as possible. You can feel confident knowing that all excavation jobs are backed by a workmanship warranty. Call us today for same-day services or FREE estimates.


Best and Backyards. Monroe, CT

For this project, Cirone Construction and Carting provided the site work to renovate the current property from an unusable site that constantly flooded to a water-controlled site that provided correct drainage and additional parking.


  • Customer: Best and Backyards 
  • Sitework concrete 
  • Asphalt 
  • Excavation 
  • Drainage 
  • GPS grading
  • Rock Hammering and Crushing 
  • Import of structural fill to raise grade 
Return to Top

Dunkin Donuts. Poughkeepsie, NY

For this project, Cirone Construction and Carting provided the full-scope site work package, utility, and demolition of an existing building and vault.


  • Customer: E.asher Construction 
  • Structural demolition 
  • Drainage
  • Asphalt paving 
  • Sitework concrete 
  • Saw cutting of foundation and concrete walls 
  • The removal of a 20x20 vault
Return to Top

Dunkin Donuts. Airmont, NY

For this project, Cirone Construction and Carting provided the full scope site work package for the renovation of an existing Gulf Gas station, which expanded the blueprint of the building and added a parking area as well as a new Drive-through.


  • Customer: E.asher Construction 
  • Utility work 
  • Drainage
  • Asphalt paving 
  • Sitework concrete 
  • Tie in to 42” live storm water system 
  • Rock hammering and removal 
Return to Top

Lawrenceville Prep Varsity and Jr Varsity Softball Fields

For this project, Cirone Construction and Carting provided the site work to build 2 high school softball fields, which included modular dugouts, backstops, a new infield mix, and a batting tunnel.


  • Sitework concrete
  • Laser grading
  • Excavation
  • Drainage
  • Modular dugouts
  • Fencing
Return to Top

Lawrenceville Prep Athletic Fields

For this project, Cirone Construction and Carting provided the site work to build a new grass athletic field, which included an 8000-yard stone retention system, NCAA-rated class 5 athletic track and pole vault, and long jump events.


  • Laser grading
  • Excavation
  • Retention system
  • Drainage
  • Level 5 athletic track
  • 82,000 sq ft playing field
  • Asphalt paving
  • Sitework concrete
Return to Top

Metro North Upper Harlem Parking Project

For this project, Cirone Construction and Carting provided the full-scope Demolition and structural backfill of an existing school, church, convent, and warehouse.


  • Customer: Metro North Railroad 
  • Structural demolition
  • Waste tracking 
  • Waste hauling
  • Concrete crushing
  • Structural backfill
  • Foundation hammering and removal
Return to Top

OGE Elementary School

For this project, Cirone Construction and Carting provided the site work renovation to expand the existing parking lot, and correct drainage issues the school was currently having. The project was GPS-graded to correct existing eroding issues and elevation issues. The sidewalk and new parking lot asphalt were completed under Cirone. 


  • Customer: Wappingers Central Schools
  • Sitework concrete
  • Asphalt
  • Excavation
  • Drainage
  • GPS grading
Return to Top

Quarry Management

For this project, Cirone Construction and Carting provided the site work to move, fill, and compact 108,000 yards in order to create additional space for the quarry holding yard and create a pad site for a future warehouse distributor. 


  • GPS machine control
  • Mass excavation
  • Retention pond
  • Drainage
  • 6,500 yards moved and compacted daily
Return to Top

Wappingers Junior High School

For this project, Cirone Construction and Carting provided the site work renovation to expand the existing parking lot and correct drainage issues the school was currently having. The project consisted of over 2,000 lnft of curb, 10,000 ft of sidewalk, and 110,000 sqft of regraded and corrected sub-base with new asphalt.


  • Customer: Wappingers Central Schools 
  • Sitework concrete
  • Asphalt
  • Excavation
  • Drainage
  • GPS grading
Return to Top
Share by: